(A)CONSTRUCTION WORKS RATE(Excluding cost materials):
Sl No | Description | Unit | Rate(TK) |
1 | Breaking 20mm/12mm down Brick chips | Per % cft | 935.00 |
2 | Breaking 20mm/12mm down Stone chips | Per % cft | 1,683.00 |
3 | Placing and Removing shutter for form-work | Per % sft | 10.20 |
4 | Making steel shutter for form-work | Per % sft | 51.00 |
5 | Making steel door-window frame&shutter | Per % sft | 40.80 |
6 | Making Fixed steel glazed frame | Per % sft | 23.80 |
7 | Making steel grill | Per % sft | 34.00 |
8 | Filling& stitching gunny bags | Per bag | 6.80 |
9 | Load testing result sheet preparation | Per test | 1700.00 |
10 | Carrying cost & Timber | Per cft | 17.00 |
11 | Seasoning timber in plant | Per cft | 187.00 |
12 | Carrying cost of steel door and window | Each | 34.00 |
13 | Fabrication and erection of mild steel truss | Per cwt | 1360.00 |
14 | Fabrication of light section steel | Per cwt | 170.00 |